New routes from 1 November 2017 due to construction works - New routes

Binnenweg, Buitenweg and their associated off-ramps will be closed from November 1. This will impact both local and freight traffic. Traffic towards Skyport and Jan Dellaertplein will be diverted to Havenmeesterweg. Traffic coming from local roads toward Vertrekpassage (Departures) can still do so by following Retourbaan. Signs will be in place which will direct you to the new routes.

Traffic towards Skyport and Jan Dellaertplein

Omleiding wegwerkzaamheden Skyport en Jan Dellaertplein 1 november

From Amsterdam (A4): At Ceintuurbaan Zuid, take the exit toward Cargo. Follow the exit to the end. Turn right, then turn left on to Havenmeesterweg.

From Den Haag (A4): Take the exit towards Cargo, then turn right at the traffic lights towards Westelijke Randweg. At the end, turn left on to Handelskade and drive straight on to reach Havenmeesterweg.

From Schiphol Zuid: Follow Handelskade and drive straight ahead to reach Hanevnmeesterweg.

From Schiphol Noord: Follow Westelijke Randweg. Turn left at the end toward Handelskade, and drive straight ahead to reach Havenmeesterweg.

View the new route for traffic to Skyport and Jan Dellaertplein (pdf)

Traffic in the direction of Vertrekpassage (Departures)

Wegwerkzaamheden vertrek

No changes from Amsterdam and The Hague on the A4.

From Schiphol Zuid: From Handelskade, take Westelijke Randweg. Follow this road until the intersection which connects to Schiphol Boulevard. Turn right on to the A4 in the direction of The Hague, then follow the signs to Departures. This way, you will take Retourbaan to reach Ceintuurbaan Zuid.

From Schiphol Noord: Follow Westelijke Randweg until you reach the intersection with Schiphol Boulevard. Turn left on to the A4 in the direction of The Hague. Then follow the signs to Departures. This way, you will take Retourbaan to reach Ceintuurbaan Zuid.

View the new route for traffic to Departures (pdf)

Why new routes are being added

Preparations for the construction of our new pier and terminal are in full swing. In addition to the demolition of the P2 car park, more space must be created. The roads in the areas between P1 and P2 – Binnenweg, Buitenweg and their corresponding off-ramps – will close. These roads run under Ceintuurbaan Zuid along P2, and will be removed to make way for cables, pipes and new roads. In the future, this will become the roadway for the new terminal.